After a holiday hiatus, my wife, Sonia, and I continue our remodeling saga.

January 20th

Not many contractors have a fabricating shop for granite and marble, let alone allow clients to give direct input on how the stone will be cut. Fortunately, ours is one of the few.

This morning, we met Wei, the granite man, at the contractor's facility. Sonia and I were able to point out the most pleasing patterns in the stone and say where they would go in the kitchen. We had bought three, large slabs just so we would have this flexibility. Wei followed us back to the house to verify his measurements and double check our choice of bull nose edging.

Initially, we decided on a simple, ¾” beveled bull nose. Today, as we looked at it, we realized the supporting plywood would show unless covered by cabinet molding. This will not work on the curved portion of the countertop.

Now, having more information, we changed our selection to a 1½” DuPont bull nose. This entails gluing two granite pieces together to create the edging. It will look wonderful and cover the underlying plywood, but will come at a higher price for labor, a familiar theme during our remodeling project. Again, having that extra granite slab has saved us.

We also discussed if the full-height, granite backsplash would be flush with the end cabinets or with the counter and the style of the granite window sill over the kitchen sink. Happily, Wei seems to understand our preferences and we are grateful that he is part of a crew that solicits our input.

Courtney, the man we hired to install glass in the new shower, did not show up nor return my three voice mail messages. Finally, he called after 8 PM and said he had had a family emergency. We understood his situation, but we are in a time crunch as the crew must finish the master bath in the next few days. He agreed to come on Sunday, January 22nd to put in the glass.

January 22nd

Courtney came and installed the shower glass perfectly. It is even better than we envisioned.

January 23rd

The heating contractor came back to put in the thermostat. The entire house is now heated, not just the room where we have been “camping” these past months.

January 24th

The replacement kitchen cabinet was delivered and put in place. Our toilet and pedestal sink were reinstalled in the newly expanded master bath. The electrician mounted the light fixture and my shaving mirror. Finally, one room is complete.

I called the floor refinishing people and got on the schedule for March 6th, the earliest they can begin. Sam, the foreman, tried to put in the kitchen sink foot pedal, but one of the internal parts had been damaged during manufacturing. A replacement part is being mailed to us.

After Sam completed the new molding around the existing, in-the-wall, ironing board, we noticed something missing -- the electric outlet that used to be to the right had disappeared. We asked Lee, the electrician's number one man, and he pointed to the plans, where the ironing board was included, but the outlet was not.

Lee, who had previously been very diligent about checking with us, had gone ahead and removed the outlet without asking how we could use an ironing board without electricity. Needless to say, we had Lee put in another outlet inside the ironing board frame. As before, we were blindsided by architect carelessness, adding to our costs.

January 30th

Wei made a third house visit to measure again for granite. There is a problem with a section of wall that is out-of-square. The granite will be installed on February 2nd and, although everything else will be pre-cut; Wei will cut that section at the house to assure it fits properly.

February 1st

A mega-problem – we did not know that the wrong bathtub had been delivered for the hall bath until it was installed. It had been wrapped up in a wooden crate until then. It is too shallow and, as Sonia pointed out, looks exactly like a Victorian coffin.

We are told the correct one will not arrive for three weeks. This stops all construction and will delay completion. To save time, we will have the painter begin while we await bathtub delivery.

February 2nd

Exciting day – granite will be installed today. Good news and bad news: six men struggled mightily to carry the largest slab (nine feet long, over 400 lbs.) up our twelve steps, around a tight corner and into the kitchen.

The good news is it is gorgeous and the bull nose perfect. Bad news is they dropped it, breaking a section of bull nose, including one of the curved corners. Wei swore he could fix it so no one will notice. To our relief, his repairs were seamless.

The Brazilian stone, a million years in the making, has a three dimensional feel of moving water in its creams, blacks, silvers, russets, whites and plums. The new countertops are even more beautiful than we had imagined.

Related Articles:  Journal of a Remodelee, Part 1Part 2Part 3Part 4Part 5Part 6Part 8Part 9Part 10Part 11

Don Dunning has been a full-time, licensed real estate agent since 1979 and a broker since 1982 and is past president of the Oakland Association of Realtors. He provides sales and hourly listing or consulting services with Wells & Bennett Realtors in Oakland and is an expert witness in real estate matters. Call him at (510) 485-7239, or e-mail him at , to put his knowledge and experience to work for you.

HOME  |  BACK TO BLOG  ||  BACK TO TOP

Copyright © 2007-2015 by Don Dunning
Permission is given to freely copy any or all articles for personal and
noncommercial use provided they are copied in full without
modification and that proper attribution is given.
These articles may not be published, broadcast, rewritten, nor linked to from another site.
 

Banner photo by S. Dunning, Copyright © 2007-2015
Digital photo of San Francisco skyline taken from Treasure Island, SFBay